40 kgf / 392 N Class · up to 91,500 rpm
Forty kilos of thrust from a 149.5 mm airframe that weighs 4.6 kg, starts from cold in 45 seconds, and ships with its RS-232 protocol published command by command. This is the short-life, low-cost end of the range — built for platforms where a 25-hour engine treated as a consumable makes more sense than a rebuildable core.
Every parameter below comes from the manufacturer's V2.2 datasheet, measured at sea-level standard atmosphere in static condition. Where the sheet gives a limit rather than a nominal, the limit is what you see here.
Cold engine to idle in under 45 seconds, fully automatic once the start command is on the bus. No manual priming, no sequence for the operator to memorise, no skill in the loop.
Eleven command codes, a 36-byte telemetry frame every 40 ms, bit-level warning and fault words. Your flight-control team writes the driver from the datasheet, not from a support ticket.
After a flame-out, once speed falls below 6,000 rpm with altitude and airspeed inside the start envelope and every sensor healthy, the ECU relights on its own. No ground command needed.
Ten consecutive out-of-range speed readings and the ECU freezes pump speed and hands control back to you rather than chasing a bad signal. Ten clean readings and it returns to closed loop by itself.
392 N out of 4.6 kg dry. On a 70 kg airframe that is a 0.57 installed thrust-to-weight ratio with margin left for climb, and the 149.5 mm diameter keeps the nacelle small.
Bearing inspection and turbine clearance at 25 hours — roughly 150 ten-minute sorties. It is a short-life design on purpose. The number that matters here is cost per flight hour, not the rebuild count.
Civil and commercial domains within the stated scope of use.
Short sorties, high cycle count, engine treated as a consumable. The 25-hour TBO and the 45-second start match that duty cycle better than a long-life core does.
Ma 0.7 and a 9,000 m ceiling cover the usual reconnaissance and survey profiles, with 392 N of thrust behind a 150 mm nacelle.
The published RS-232 protocol and bit-level fault words make it a workable teaching platform — students log every state transition instead of treating the ECU as a black box.
Used as a thrust source for inlet, nozzle and airframe integration work before a larger engine is committed to the programme.
At 392 N the SF40 sits just under the 400 N threshold used in dual-use classification (9A012.b.3, China's dual-use export control list effective 18 November 2026). Eight newtons is not a margin we treat as comfortable, so every SF40 export order is reviewed individually rather than waved through as uncontrolled.
What we need before a contract: end-user certificate naming the platform, the operator and the end use; a statement of destination; and confirmation that the application is civil or commercial. An export licence is required where the destination or the stated application calls for one. We do not accept a bare purchase order on this thrust class.
Every engine ships with a manufacturer's certificate of conformity and full shipping documentation. Accessory set: engine unit, ECU, GSU, mounting band set, power cable, signal cable, ball valve, fuel filter and 1.5 m of fuel line.
40 kgf minimum, which is 392 N or 88 lbf at sea-level static conditions. Maximum core speed is 91,500 rpm, exhaust gas temperature stays at or below 850 °C, and specific fuel consumption is 1.55 kg per kgf per hour or better.
4.6 kg dry or less for the bare engine, with a maximum diameter of 149.5 mm and an overall length of 372.4 mm. That gives a bare-engine thrust-to-weight ratio of 8.7 : 1. Add the ECU, GSU, pump, valves, tubing and harness for your installed weight — we quote that per configuration rather than publishing one number.
At 1.55 kg/(kgf·h) and 40 kgf, roughly 62 kg of blended kerosene per hour, or about 78 litres at a density of 0.8 g/ml. The blend is RP-3 with 5% Mobil Pegasus II or AeroShell 500 by volume.
Roughly 60 to 90 kg maximum take-off weight at an installed thrust-to-weight ratio of 0.5 to 0.65. Treat that as a starting point rather than a limit — wing loading, climb requirement and how much of the sortie sits at maximum thrust all move the number.
It sits under the 400 N control threshold at 392 N, but only by 8 N, so every order is reviewed individually rather than treated as uncontrolled. An end-user certificate is required in all cases, plus a licence where the destination or application calls for one. Full detail is on the compliance page.
25 hours of running time for bearing inspection and turbine clearance, about 150 ten-minute sorties. Turnaround time and service kit price are quoted per project because both depend on where the engine is based.
A 36-byte frame every 40 ms over RS-232 at 115,200 bps, 8N1, on a DB15 male connector. The frame carries speed, exhaust temperature, ECU mode, current, alarm word, fault word and switch word, all documented bit by bit. Warning and fault bits latch, so a post-flight read still shows what happened.
Under 45 seconds from cold to idle on the ground, with acceleration inside 18 seconds and deceleration inside 25 seconds. In flight, after a flame-out, the ECU relights automatically once speed falls below 6,000 rpm with altitude below 5,500 m and airspeed below 450 km/h, provided every sensor and accessory reports healthy.
At 40 kgf the trade-off is cost per flight hour against installed weight. The SF40 is the short-life, low-cost platform: 4.6 kg, 91,500 rpm, 25-hour TBO, built for high-cycle work where the engine is a consumable. Lighter general-purpose units in this class exist at around 3.2 kg dry and suit airframes where every gram of installed weight counts — if that is your case, send us the airframe and the model you are comparing and we will return a line-by-line table. If the engine is going to be run hard and replaced on a schedule, this is the one.
Send the model, quantity, destination country and intended use. A written quotation with the full datasheet comes back. Prices are quoted per order rather than published as a list, because ECU version, harness length, spare kit and the export documentation set all change the number.
Tell us the airframe, the duty cycle and the destination — we reply with a quote and the full datasheet.