80 kgf / 784 N Class · 30,000–60,200 rpm
784 N from a 202 mm airframe weighing 10.5 kg. Four measured operating points, a 50-second ground start, and an RS-422 ECU protocol published down to the bit — including the RS-232 fallback on the same connector.
Sea-level standard atmosphere, static condition. Four points are published rather than one, because a single maximum figure tells you nothing about how the engine behaves at cruise.
Most suppliers publish six numbers and call it a datasheet. This one publishes the frame layout, every status bit, and what the ECU does when a sensor fails.
36-byte telemetry frame every 40 ms, 13 command codes, 8 operating states, 9 warning bits, 13 fault bits and 6 switch bits — all defined. You can write the parser before the engine arrives.
Differential RS-422 on pins 1–5 carries telemetry over long harness runs without ground-loop noise. Pins 7–9 carry RS-232 on the same DB9, so you can bench-test with a laptop before the flight harness exists.
On an abnormal flameout the ECU closes the actuators and drops to shutdown. Once speed falls below 8,000 rpm, with altitude below 5,000 m and airspeed below 300 km/h reported by the flight controller, it restarts itself. A shutdown command aborts the sequence.
Maximum, rated, intermediate and idle each carry their own thrust, EGT, SFC and air flow. Cruise fuel burn is a lookup, not an estimate — 59 kgf at 55,000 rpm burns 1.48 kg/(kgf·h), not 1.38.
A failed speed signal switches closed-loop regulation to open-loop backup at the current pump speed. A failed P2 or T2 sensor reconstructs inlet pressure and temperature from flight-controller data. Only accessory faults block a start.
This is a short-life engine and the datasheet says so. 25 hours buys a 10.5 kg powerplant at a fraction of the cost of a long-life unit, and the overhaul interval is the trade you are making.
Roughly 120 to 180 kg maximum take-off weight at an installed thrust-to-weight ratio of 0.45 to 0.6. Treat it as a starting point; wing loading and climb requirement move the number.
High subsonic dash, repeated sorties, engine treated as a consumable. The 25-hour TBO and the low purchase price are designed for exactly this duty cycle.
Ma 0.9 ceiling with a 12,000 m operating altitude. The intermediate rating gives an unlimited-duration cruise point at 59 kgf.
Four published operating points, full telemetry, and a documented fault table make it usable as a teaching and measurement platform, not just a powerplant.
RS-232 on the same connector means a laptop can drive the engine on the bench. Cool-down running at 2,500 rpm protects the turbine between test cycles.
At 784 N the SF80 is a controlled item under dual-use classification (9A012.b.3, China's dual-use export control list effective 18 November 2026). Every export requires a licence. We do not accept bare purchase orders on this thrust class — an end-user certificate and a stated civil application are required before a contract is issued. If you are unsure whether your destination or application is eligible, ask before you order.
80 kgf maximum at 60,200 rpm, which is 784 N or 176 lbf at sea-level static conditions. Rated thrust is 78 kgf at 60,000 rpm for up to 60 minutes, intermediate is 59 kgf at 55,000 rpm with no time limit, and idle is 12 kgf or less at 30,000 rpm. Maximum thrust is limited to 10 minutes.
10.5 kg dry for the bare engine, with a 202 mm maximum diameter and 479 mm overall length, giving a bare-engine thrust-to-weight ratio of 7.6 : 1. The ECU, GSU, pump, valves, tubing and harness add to that; installed weight is quoted per configuration because harness length and accessory mounting change the number.
At the intermediate point — 59 kgf at 55,000 rpm — specific fuel consumption is 1.48 kg/(kgf·h), so roughly 87 kg per hour. At maximum it is 1.38 kg/(kgf·h) and about 110 kg/h. Idle burns 3.8 kg/(kgf·h) but only produces 12 kgf, so idle time is cheap in absolute terms but expensive per unit of thrust.
Roughly 120 to 180 kg maximum take-off weight at an installed thrust-to-weight ratio of 0.45 to 0.6. Wing loading, climb requirement and how much of the sortie sits at maximum thrust all move that range — a draggy airframe that needs continuous dash will sit at the top of the band or above it.
Yes. At 784 N it is well above the 400 N threshold used in dual-use classification (9A012.b.3), so every export requires a licence plus an end-user certificate. We do not accept bare purchase orders on this thrust class, and we need the civil application stated in writing before a contract is issued.
A 36-byte frame every 40 ms over RS-422 at 115,200 bps, 8N1, on a DB9 male connector. It carries speed, EGT, ECU mode, engine status, warning word, fault word, switch word, target speed, supply voltage and current, inlet total pressure and temperature, ECU temperature, fuel pump speed, two accessory fault codes, fuel pressure and a frame counter — each with a defined scale and unit.
Yes. The same DB9 carries RS-232 on pins 7, 8 and 9 alongside the RS-422 differential pair, so a laptop or a bench terminal can read telemetry and send commands before the aircraft harness exists. Bench testing over RS-232 first is the fastest way to confirm wiring before you commit to a flight build.
The ECU closes the actuators and enters shutdown. Once speed drops below 8,000 rpm, and the flight controller reports altitude below 5,000 m and airspeed below 300 km/h, the ECU restarts the engine on its own. Sending a shutdown or emergency shutdown command aborts the restart sequence, which is how you keep manual control of the decision.
At 80 kgf the trade-off is installed weight against control architecture. The SF80 is 10.5 kg, runs to 60,200 rpm, carries a 28 V DC system and an RS-422 bus with a documented 36-byte protocol, and is built as a short-life powerplant. Lighter units in this class exist at around 8.4 kg dry with PWM throttle and RS-232 telemetry — the right answer where every gram counts and the control system is already analogue. If weight is your binding constraint, send us the airframe and the model you are comparing and we will return a line-by-line table.
Send the quantity, destination country and intended civil application. A written quotation with the full datasheet comes back. Prices are quoted per order rather than published as a list, because accessory set, harness length, spare kit and the export documentation package all change the number.
Send your platform weight, mission profile and destination country. We will confirm whether the SF80 covers the requirement, send the complete specification including the frame layout and fault table, and quote with the export documentation set your destination needs.